Perkins, 4.236, Documentatie tehnica, Operation instructions

Preventive maintenance periods

New 1000 Serie » Preventive maintenance periods

These preventive maintenance periods apply to average conditions of operation. Check the periods given by the manufacturer of the equipment in which the engine is installed. If necessary, use the shorter periods. When the operation of the engine must conform to the local regulations these periods and procedures may need to be adapted to ensure correct operation of the engine. It is good preventive maintenance lo check for leakage and loose fasteners at each service.

These maintenance periods apply only to engines thaï are operated with fuel and lubricating oil which conform lo the specifications given in this handbook.

Inapoi Seria motor Perkins New 1000 Serie
Comercializam alternatoare pentru buldozere, buldoexcavatoare, excavatoare si incarcatoare Komatsu.600-811-3150, 600-821-2330, 600-821-2340, 600-821-2350, 600-821-3120, 600-821-3260,600-821-3350, 600-821-3370, 600-821-3571, 600-821-3580, 600-821-3840, 600-821-3850,600-821-3860, 600-821-3870, 600-821-5170, 600-821-5171,
mai multe detalii ...
Documentatie tehnica, Operation instructions, 4.236, Perkins
Hitachi Construction Machinery (Europe) si-a extins gama traditionala de excavatoare Zaxis. Modelul ZX145W-3 cu raza scurta foloseste cele mai recente motoare si sisteme hidraulice si este ideal pentru operarea în locuri înguste, zone urbane sau rezidentiale. Inginerii Hitachi au dezvoltat noul excavator
mai multe detalii ...
Perkins, Operation instructions, Documentatie tehnica, 4.236

Sediu : 700045 Iasi, Strada Sfantul Lazar nr. 27, Kapital Invest Building -  etajul 2
Depozit :
700382 Iasi,Str. Aurel Vlaicu 88
600343 Bacau,Str. Letea 32
062202 Bucuresti, Str. Preciziei 32
2059 Chisinau, Str. Petricani 19/4

Societate aflata in insolventa prin hotararea Tribunalului Iasi din 21 martie 2025, dosar nr. 1116/99/2025

Telefon Romania:

+40 743 122 261
office@commatech.ro