Atomiser fault

3.152 Series » Atomiser fault

An atomiser fault can cause an engine misfire.

In order to find which atomiser is detective, operate the engine at a fast idle speed. Loosen and tighten the union nut of the high-pressure fuel pipe at each atomiser. When thé union nut of the detective atomiser is loosened, it has little or no effect on the engine speed.

Warning! Ensure that the fuel does not spray onto your skin. Keep away from moving parts during engine operation. Some moving parts canner, be seen clearly while the engine runs.

How to renew an atomiser

Caution: Do not allow dirt to enter the fuel System. Before a connection is disconnected, clean thoroughly the area around the connection. After a component has been disconnected, fit a suitable cover to all open connections.

  1. Remove the fuel leak-off pipe.
  2. Remove the union nuls of the high-pressure pipe from the atomiser and from the fuel injection pump. Do not bend the pipe. If necessary, remove the pipe clamps.
  3. Remove the atomiser flange nuts and remove the atomiser and its seat washer. Remove the dust seal and the spacer and fit îhe spacer and a new dust seal on the new atomiser.
  4. Put the new atomiser in position with its spacer, new dust seal and a new seat washer. Ensure that the fuel leak-off connection is not toward the engine. Ensure that the atomiser is not tilted and tighten the flange nuts evenly and gradually to 16 Nm (12 Ibf ft) 1.7 kgf m. if the atomiser is retained by a separate clamp. Tighten the nuts 1o 12 Nm (9lbffl) 1.2 kgf m.
  5. Caution: Do not tighten the union nuts of the high pressure pipes more than the recommended torque tension. If there is a leakage from the union nut, ensure that the pipe is correctly aligned with the atomiser inlet. Do not tighten the atomiser union nut more, as this can cause a restriction at the end of the pipe. This can affect the fuel delivery.

  6. Fit the high-pressure fuel pipe and tighten the union nuts to 22 Nm (16 Ibf ft) 2,2 kgf m. H necessary, fit the pipe clamps.
  7. Renew the aluminum washers and fit the Ieak-off pipe.
  8. Operate the engine and check for leakage of fuel and air.
Inapoi Seria motor Perkins 3.152
Noul buldozer dispune de un motor de 634 kW (850 de cai), de lame ce se pot deplasa până la 43,6 mᵌ și constructorii indică o greutate de serviciu de ceva mai mult de 112 de tone. Noua motorizare permite modelului să răspundă exigențelor normelor americane Tier 4 al EPA. Emisiile de oxid de azot în
mai multe detalii ...
Noul excavator hidraulic Cat 374 D îmbină o putere crescută a motorului, sisteme hidraulice mai puternice şi o greutate operaţională mai mare de 70.780 kg pentru a spori capacitatea de încărcare, ridicare şi săpare. Noul model 374D a fost astfel creat încât să ofere fiabilitate, costuri
mai multe detalii ...

Sediu : 700045 Iasi, Strada Sfantul Lazar nr. 27, Kapital Invest Building -  etajul 2
Depozit :
700382 Iasi,Str. Aurel Vlaicu 88
600343 Bacau,Str. Letea 32
062202 Bucuresti, Str. Preciziei 32
2059 Chisinau, Str. Petricani 19/4

Societate aflata in insolventa prin hotararea Tribunalului Iasi din 21 martie 2025, dosar nr. 1116/99/2025

Telefon Romania:

+40 743 122 261
office@commatech.ro