,BERCO MU3028/43/300,BERCO VA1191/43/300,ITM L14302B0N43300,CATERPILLAR,Miniexcavator,303.5,DCH-1-UP

How to check the valve tip clearances

1000 series » How to check the valve tip clearances

These are checked between the top of the valve stem and the rocker lever (A), with the engine hot or cold. The correct clearance for inlet valves is 0,20 mm (0.008 in) and 0,45 mm (0.018 in) for exhaust valves. The valve positions are shown at (B).

The sequence of valves from number 1 cylinder is shown in the table below.

Note: Number 1 cylinder is at the front of the engine.

Four cylinder engines

  1. Rotate the crankshaft in the normal direction of rotation until the inlet valve (B8) of number 4 cylinder has just opened and the exhaust valve (B7) of the same cylinder has not closed completely. Check the clearances of the valves (B1 and B2) of number 1 cylinder and adjust them, if necessary.
  2. Set the valves (B3 and B4) of number 2 cylinder as indicated above for number 4 cylinder. Then check / adjust the clearances of the valves (B5 and B6) of number 3 cylinder.
  3. Set the valves (B1 and B2) of number 1 cylinder. Then check / adjust the clearances of the valves (B7 and B8) of number 4 cylinder.
  4. Set the valves (B5 and B6) of number 3 cylinder. Then check / adjust the clearances of the valves (B3 and B4) of number 2 cylinder.

Six cylinder engines

  1. Rotate the crankshaft in the normal direction of rotation until the inlet valve (A12) of number 6 cylinder has just opened and the exhaust valve (A11) of the same cylinder has not closed completely. Check the clearances of the valves (A1 and A2) of number 1 cylinder and adjust them, if necessary.
  2. Set the valves (A4 and A3) of number 2 cylinder as indicated above for number 6 cylinder. Then check / adjust the clearances of the valves (A9 and A10) of number 5 cylinder.
  3. Set the valves (A8 and A7) of number 4 cylinder. Then check / adjust the clearances of the valves (A5 and A6) of number 3 cylinder.
  4. Set the valves (A1 and A2) of number 1 cylinder. Then check / adjust the clearances of the valves (A11 and A12) of number 6 cylinder.
  5. Set the valves (A9 and A10) of number 5 cylinder. Then check / adjust the clearances of the valves (A3 and A4) of number 2 cylinder.
  6. Set the valves (A5 and A6) of number 3 cylinder. Then check / adjust the clearances of the valves (A7 and A8) of number 4 cylinder.




Inapoi Seria motor Perkins 1000 series
Producatorul Case a prezentat in 2014 la salonul Conexpo noul model de incarcator frontal pe pneuri numit Case 921F. Noul incarcator se bucura de un randament energetic mai bun si este mai performant decat modelele precedente.Echipat cu un motor de 6.7 litri care dezvolta o putere de 168 kW este echipat cu tehnologia S
mai multe detalii ...
CATERPILLAR, BERCO VA1191/43/300, DCH-1-UP, BERCO MU3028/43/300, 303.5, ITM L14302B0N43300, Miniexcavator,
Case Construction Equipment este unul dintre liderii mondiali in productia de excavatoare, fiind totodata si fabricantul primului excavator hidraulic din lume, in anul 1951. Aprecierea obtinuta la nivel mondial de catre producatorul american se datoreaza atentiei constante acordate noilor tehnologii, inovatiilor si a p
mai multe detalii ...
BERCO VA1191/43/300, BERCO MU3028/43/300, DCH-1-UP, ITM L14302B0N43300, CATERPILLAR, , Miniexcavator, 303.5

Sediu : 700045 Iasi, Strada Sfantul Lazar nr. 27, Kapital Invest Building -  etajul 2
Depozit :
700382 Iasi,Str. Aurel Vlaicu 88
600343 Bacau,Str. Letea 32
062202 Bucuresti, Str. Preciziei 32
2059 Chisinau, Str. Petricani 19/4

Societate aflata in insolventa prin hotararea Tribunalului Iasi din 21 martie 2025, dosar nr. 1116/99/2025

Telefon Romania:

+40 743 122 261
office@commatech.ro