Nr. Crt. Description Delay Qty, € / Piece Total WEIGHT / kg Grand Total 1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76 2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00 3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00 4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00 5 TRANSPORT COST TO THESSALONIKI 2 200 400 2500.00 2900.00 TOTAL (EURO) 6024.76 2500.00 8524.76,O&K,RH6PMS

UNDERCARRIAGE SPARE PARTS UP-DATE O&K RH6PMS

Nr. Crt. Description Delay Qty, € / Piece Total WEIGHT / kg Grand Total
1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76
2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00
3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00
4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00
5 TRANSPORT COST TO THESSALONIKI   2 200 400 2500.00 2900.00
    TOTAL (EURO)     6024.76 2500.00 8524.76
 Case a început producţia mini încărcătoarelor multifuncţionale în 1969 odată cu apariţia pe piaţă a modelului 1530 Uni-Loader şi a continuat să inoveze domeniul, prin introducerea unor elemente specifice precum Ride Control sau iluminarea laterală a câmpului de lucru. Anul trecu
mai multe detalii ...
O&K, Nr. Crt. Description Delay Qty, € / Piece Total WEIGHT / kg Grand Total 1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76 2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00 3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00 4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00 5 TRANSPORT COST TO THESSALONIKI 2 200 400 2500.00 2900.00 TOTAL (EURO) 6024.76 2500.00 8524.76, RH6PMS
Stivuitorul TELESCOPIC JCB 550-80 va fi ideal pe santiere sau in industrie. Acest stivuitor de santier permite manipularea unor incarcaturi de 5 tone. La inaltimea sa maxima, putin mai mult de 8 metri, poate ridica pana la 2,5 tone. Noul stivuitor de santier TELESCOPIC 550-80 de la JCB este echipat cu un sis
mai multe detalii ...
O&K, Nr. Crt. Description Delay Qty, € / Piece Total WEIGHT / kg Grand Total 1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76 2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00 3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00 4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00 5 TRANSPORT COST TO THESSALONIKI 2 200 400 2500.00 2900.00 TOTAL (EURO) 6024.76 2500.00 8524.76, RH6PMS

Sediu : 700045 Iasi, Strada Sfantul Lazar nr. 27, Kapital Invest Building -  etajul 2
Depozit :
700382 Iasi,Str. Aurel Vlaicu 88
600343 Bacau,Str. Letea 32
062202 Bucuresti, Str. Preciziei 32
2059 Chisinau, Str. Petricani 19/4

Societate aflata in insolventa prin hotararea Tribunalului Iasi din 21 martie 2025, dosar nr. 1116/99/2025

Telefon Romania:

+40 743 122 261
office@commatech.ro