Nr. Crt. Description Delay Qty, € / Piece Total WEIGHT / kg Grand Total 1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76 2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00 3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00 4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00 5 TRANSPORT COST TO THESSALONIKI 2 200 400 2500.00 2900.00 TOTAL (EURO) 6024.76 2500.00 8524.76,O&K,RH6PMS

UNDERCARRIAGE SPARE PARTS UP-DATE O&K RH6PMS

Nr. Crt. Description Delay Qty, € / Piece Total WEIGHT / kg Grand Total
1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76
2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00
3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00
4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00
5 TRANSPORT COST TO THESSALONIKI   2 200 400 2500.00 2900.00
    TOTAL (EURO)     6024.76 2500.00 8524.76
O întreaga flota de utilaje produse de New Holland Construction este implicata în constructia conductei de gaz metan Cellino-Teramo de pe coasta Marii Adriatice. În prima linie de atac se afla trei excavatoare din noua "Serie C" E305. Un debut impresionant pentru un utilaj inovator. La doar
mai multe detalii ...
RH6PMS, O&K, Nr. Crt. Description Delay Qty, € / Piece Total WEIGHT / kg Grand Total 1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76 2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00 3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00 4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00 5 TRANSPORT COST TO THESSALONIKI 2 200 400 2500.00 2900.00 TOTAL (EURO) 6024.76 2500.00 8524.76
Încărcătoarele compacte Volvo pe roţi combină componentele tehnice de calitate dovedită cu cele de înaltă tehnologie într-un mod care respectă pe deplin cerinţele practicii moderne de construcţii şi satisface cele mai stricte cerinţe de calitate. Silueta lor distinctivă cu contururi rotu
mai multe detalii ...
O&K, € / Piece Total WEIGHT / kg Grand Total 1 Track link assy 50 links O&K RH6PMS 5/7 DAYS 2 1198.38 2396.76 0.00 2396.76 2 Track bolts O&K RH6PMS 5/7 DAYS 400 0.77 308 0.00 308.00 3 Track nut O&K RH6PMS 5/7 DAYS 400 0.45 180 0.00 180.00 4 Track shoe 700mm O&K RH6PMS 5/7 DAYS 100 27.4 2740 0.00 2740.00 5 TRANSPORT COST TO THESSALONIKI 2 200 400 2500.00 2900.00 TOTAL (EURO) 6024.76 2500.00 8524.76, Nr. Crt. Description Delay Qty, RH6PMS

Sediu : 700045 Iasi, Strada Sfantul Lazar nr. 27, Kapital Invest Building -  etajul 2
Depozit :
700382 Iasi,Str. Aurel Vlaicu 88
600343 Bacau,Str. Letea 32
062202 Bucuresti, Str. Preciziei 32
2059 Chisinau, Str. Petricani 19/4

Societate aflata in insolventa prin hotararea Tribunalului Iasi din 21 martie 2025, dosar nr. 1116/99/2025

Telefon Romania:

+40 743 122 261
office@commatech.ro