Nr. Crt. Descriere Disponibilitate Buc. Pret/buc. fără T.V.A Pret total fără T.V.A. T.V.A. TOTAL 1 SEAL-LIP TYPE POZ 1 PLANSA 1 10/12 ZILE 2 16.39 32.78 6.23 39.01 4 PIN AS POZ 4 PLANSA 1 10/12 ZILE 1 274.2 274.2 52.10 326.30 5 BUSHING PLANSA 1 10/12 ZILE 2 16.52 33.04 6.28 39.32 6 PIN POZ 8 PLANSA 1 10/12 ZILE 1 96.14 96.14 18.27 114.41 7 PIN POZ 8 PLANSA 1 10/12 ZILE 1 184.69 184.69 35.09 219.78 8 SEAL-LIP TYPE POZ 2 PLANSA 2 10/12 ZILE 4 2.85 11.4 2.17 13.57 9 SHIM(1-MM THK) POZ 3 PLANSA 2 10/12 ZILE 1 8.1 8.1 1.54 9.64 10 SEAL-LIP TYPE POZ 4 PLANSA 2 10/12 ZILE 2 16.39 32.78 6.23 39.01 11 SHIM(0.6-MM THK) POZ 5 PLANSA 2 10/12 ZILE 1 7.26 7.26 1.38 8.64 12 SHIM(0.5-MM THK) POZ 6 PLANSA 2 10/12 ZILE 2 6.8 13.6 2.58 16.18 13 SHIM(1-MM THK) POZ 7PLANSA 2 10/12 ZILE 2 7.26 14.52 2.76 17.28 14 PIN POZ 8 PLANSA 2 10/12 ZILE 1 161.64 161.64 30.71 192.35 15 PIN POZ 9 PLANSA 2 10/12 ZILE 1 153.7 153.7 29.20 182.90 16 PIN POZ 10 PLANSA 2 10/12 ZILE 1 171.59 171.59 32.60 204.19 17 BUSHING POZ 11A PLANSA 2 10/12 ZILE 4 19.15 76.6 14.55 91.15 18 BUSHING POZ 11B PLANSA 2 10/12 ZILE 2 19.71 39.42 7.49 46.91 19 SHIM(0.5-MM THK) POZ 2 PLANSA 3 10/12 ZILE 7 7.1 49.7 9.44 59.14 20 SHIM(1-MM THK) POZ 3 PLANSA 3 10/12 ZILE 4 7.26 29.04 5.52 34.56 21 BOLT POZ 4 PLANSA 3 10/12 ZILE 1 171.59 171.59 32.60 204.19 22 BUSHING POZ 5A PLANSA 3 10/12 ZILE 4 69.48 277.92 52.80 330.72 23 SEAL-LIP TYPE PLANSA 3 10/12 ZILE 4 1.85 7.4 1.41 8.81 24 PIN POZ 7 PLANSA 3 10/12 ZILE 2 66.88 133.76 25.41 159.17 25 PIN POZ 9 PLANSA 3 10/12 ZILE 2 183.06 366.12 69.56 435.68 27 WASHER-HARD(11X35X2.5-MM THK) POZ 11 PLANSA 3 10/12 ZILE 1 2.2 2.2 0.42 2.62 28 TRANSPORT ROMANIA 1 55 55 10.45 65.45 TOTAL (EURO) 2404.19 456.80 2860.99,CATERPILLAR ,305C

BUCSA / BOLT CATERPILLAR 305C

 

Nr. Crt. Descriere Disponibilitate Buc. Pret/buc. fără T.V.A  Pret total fără T.V.A. T.V.A. TOTAL
1 SEAL-LIP TYPE POZ 1 PLANSA 1 10/12 ZILE 2 16.39 32.78 6.23 39.01
4 PIN AS POZ 4 PLANSA 1 10/12 ZILE 1 274.2 274.2 52.10 326.30
5 BUSHING PLANSA 1 10/12 ZILE 2 16.52 33.04 6.28 39.32
6 PIN POZ 8 PLANSA 1 10/12 ZILE 1 96.14 96.14 18.27 114.41
7 PIN POZ 8 PLANSA 1 10/12 ZILE 1 184.69 184.69 35.09 219.78
8 SEAL-LIP TYPE POZ 2 PLANSA 2 10/12 ZILE 4 2.85 11.4 2.17 13.57
9 SHIM(1-MM THK) POZ 3 PLANSA 2 10/12 ZILE 1 8.1 8.1 1.54 9.64
10 SEAL-LIP TYPE POZ 4 PLANSA 2 10/12 ZILE 2 16.39 32.78 6.23 39.01
11 SHIM(0.6-MM THK) POZ 5 PLANSA 2 10/12 ZILE 1 7.26 7.26 1.38 8.64
12 SHIM(0.5-MM THK) POZ 6 PLANSA 2 10/12 ZILE 2 6.8 13.6 2.58 16.18
13 SHIM(1-MM THK) POZ 7PLANSA 2 10/12 ZILE 2 7.26 14.52 2.76 17.28
14 PIN POZ 8 PLANSA 2 10/12 ZILE 1 161.64 161.64 30.71 192.35
15 PIN POZ 9 PLANSA 2 10/12 ZILE 1 153.7 153.7 29.20 182.90
16 PIN POZ 10 PLANSA 2 10/12 ZILE 1 171.59 171.59 32.60 204.19
17 BUSHING POZ 11A PLANSA 2 10/12 ZILE 4 19.15 76.6 14.55 91.15
18 BUSHING POZ 11B PLANSA 2 10/12 ZILE 2 19.71 39.42 7.49 46.91
19 SHIM(0.5-MM THK) POZ 2 PLANSA 3 10/12 ZILE 7 7.1 49.7 9.44 59.14
20 SHIM(1-MM THK) POZ 3 PLANSA 3 10/12 ZILE 4 7.26 29.04 5.52 34.56
21 BOLT POZ 4 PLANSA 3 10/12 ZILE 1 171.59 171.59 32.60 204.19
22 BUSHING POZ 5A PLANSA 3 10/12 ZILE 4 69.48 277.92 52.80 330.72
23 SEAL-LIP TYPE PLANSA 3 10/12 ZILE 4 1.85 7.4 1.41 8.81
24 PIN POZ 7 PLANSA 3 10/12 ZILE 2 66.88 133.76 25.41 159.17
25 PIN POZ 9 PLANSA 3 10/12 ZILE 2 183.06 366.12 69.56 435.68
27 WASHER-HARD(11X35X2.5-MM THK) POZ 11 PLANSA 3 10/12 ZILE 1 2.2 2.2 0.42 2.62
28 TRANSPORT ROMANIA   1 55 55 10.45 65.45
    TOTAL (EURO)     2404.19 456.80 2860.99
Când un buldozer începe să tragă greu, schimbă treptele cu întârziere sau pierde forță în sarcină, problema nu mai este una de confort, ci de productivitate. În astfel de situații, alegerea corectă de piese transmisie buldozer face diferența dintre o reparație rapidă și o
mai multe detalii ...
305C, Nr. Crt. Descriere Disponibilitate Buc. Pret/buc. fără T.V.A Pret total fără T.V.A. T.V.A. TOTAL 1 SEAL-LIP TYPE POZ 1 PLANSA 1 10/12 ZILE 2 16.39 32.78 6.23 39.01 4 PIN AS POZ 4 PLANSA 1 10/12 ZILE 1 274.2 274.2 52.10 326.30 5 BUSHING PLANSA 1 10/12 ZILE 2 16.52 33.04 6.28 39.32 6 PIN POZ 8 PLANSA 1 10/12 ZILE 1 96.14 96.14 18.27 114.41 7 PIN POZ 8 PLANSA 1 10/12 ZILE 1 184.69 184.69 35.09 219.78 8 SEAL-LIP TYPE POZ 2 PLANSA 2 10/12 ZILE 4 2.85 11.4 2.17 13.57 9 SHIM(1-MM THK) POZ 3 PLANSA 2 10/12 ZILE 1 8.1 8.1 1.54 9.64 10 SEAL-LIP TYPE POZ 4 PLANSA 2 10/12 ZILE 2 16.39 32.78 6.23 39.01 11 SHIM(0.6-MM THK) POZ 5 PLANSA 2 10/12 ZILE 1 7.26 7.26 1.38 8.64 12 SHIM(0.5-MM THK) POZ 6 PLANSA 2 10/12 ZILE 2 6.8 13.6 2.58 16.18 13 SHIM(1-MM THK) POZ 7PLANSA 2 10/12 ZILE 2 7.26 14.52 2.76 17.28 14 PIN POZ 8 PLANSA 2 10/12 ZILE 1 161.64 161.64 30.71 192.35 15 PIN POZ 9 PLANSA 2 10/12 ZILE 1 153.7 153.7 29.20 182.90 16 PIN POZ 10 PLANSA 2 10/12 ZILE 1 171.59 171.59 32.60 204.19 17 BUSHING POZ 11A PLANSA 2 10/12 ZILE 4 19.15 76.6 14.55 91.15 18 BUSHING POZ 11B PLANSA 2 10/12 ZILE 2 19.71 39.42 7.49 46.91 19 SHIM(0.5-MM THK) POZ 2 PLANSA 3 10/12 ZILE 7 7.1 49.7 9.44 59.14 20 SHIM(1-MM THK) POZ 3 PLANSA 3 10/12 ZILE 4 7.26 29.04 5.52 34.56 21 BOLT POZ 4 PLANSA 3 10/12 ZILE 1 171.59 171.59 32.60 204.19 22 BUSHING POZ 5A PLANSA 3 10/12 ZILE 4 69.48 277.92 52.80 330.72 23 SEAL-LIP TYPE PLANSA 3 10/12 ZILE 4 1.85 7.4 1.41 8.81 24 PIN POZ 7 PLANSA 3 10/12 ZILE 2 66.88 133.76 25.41 159.17 25 PIN POZ 9 PLANSA 3 10/12 ZILE 2 183.06 366.12 69.56 435.68 27 WASHER-HARD(11X35X2.5-MM THK) POZ 11 PLANSA 3 10/12 ZILE 1 2.2 2.2 0.42 2.62 28 TRANSPORT ROMANIA 1 55 55 10.45 65.45 TOTAL (EURO) 2404.19 456.80 2860.99, CATERPILLAR
Transmisiile vehiculelor comerciale moderne trebuie sa aiba o durata de functionareindelungata si sa asigure un maximum de eficienta si confort la schimbarea treptelor.Uleiul folosit in transmisie joaca un rol extrem de important: uleiul cu pret mic nu asigurastandardele optime si ceea ce economisesti cand il cumperi v
mai multe detalii ...
CATERPILLAR , 305C, Nr. Crt. Descriere Disponibilitate Buc. Pret/buc. fără T.V.A Pret total fără T.V.A. T.V.A. TOTAL 1 SEAL-LIP TYPE POZ 1 PLANSA 1 10/12 ZILE 2 16.39 32.78 6.23 39.01 4 PIN AS POZ 4 PLANSA 1 10/12 ZILE 1 274.2 274.2 52.10 326.30 5 BUSHING PLANSA 1 10/12 ZILE 2 16.52 33.04 6.28 39.32 6 PIN POZ 8 PLANSA 1 10/12 ZILE 1 96.14 96.14 18.27 114.41 7 PIN POZ 8 PLANSA 1 10/12 ZILE 1 184.69 184.69 35.09 219.78 8 SEAL-LIP TYPE POZ 2 PLANSA 2 10/12 ZILE 4 2.85 11.4 2.17 13.57 9 SHIM(1-MM THK) POZ 3 PLANSA 2 10/12 ZILE 1 8.1 8.1 1.54 9.64 10 SEAL-LIP TYPE POZ 4 PLANSA 2 10/12 ZILE 2 16.39 32.78 6.23 39.01 11 SHIM(0.6-MM THK) POZ 5 PLANSA 2 10/12 ZILE 1 7.26 7.26 1.38 8.64 12 SHIM(0.5-MM THK) POZ 6 PLANSA 2 10/12 ZILE 2 6.8 13.6 2.58 16.18 13 SHIM(1-MM THK) POZ 7PLANSA 2 10/12 ZILE 2 7.26 14.52 2.76 17.28 14 PIN POZ 8 PLANSA 2 10/12 ZILE 1 161.64 161.64 30.71 192.35 15 PIN POZ 9 PLANSA 2 10/12 ZILE 1 153.7 153.7 29.20 182.90 16 PIN POZ 10 PLANSA 2 10/12 ZILE 1 171.59 171.59 32.60 204.19 17 BUSHING POZ 11A PLANSA 2 10/12 ZILE 4 19.15 76.6 14.55 91.15 18 BUSHING POZ 11B PLANSA 2 10/12 ZILE 2 19.71 39.42 7.49 46.91 19 SHIM(0.5-MM THK) POZ 2 PLANSA 3 10/12 ZILE 7 7.1 49.7 9.44 59.14 20 SHIM(1-MM THK) POZ 3 PLANSA 3 10/12 ZILE 4 7.26 29.04 5.52 34.56 21 BOLT POZ 4 PLANSA 3 10/12 ZILE 1 171.59 171.59 32.60 204.19 22 BUSHING POZ 5A PLANSA 3 10/12 ZILE 4 69.48 277.92 52.80 330.72 23 SEAL-LIP TYPE PLANSA 3 10/12 ZILE 4 1.85 7.4 1.41 8.81 24 PIN POZ 7 PLANSA 3 10/12 ZILE 2 66.88 133.76 25.41 159.17 25 PIN POZ 9 PLANSA 3 10/12 ZILE 2 183.06 366.12 69.56 435.68 27 WASHER-HARD(11X35X2.5-MM THK) POZ 11 PLANSA 3 10/12 ZILE 1 2.2 2.2 0.42 2.62 28 TRANSPORT ROMANIA 1 55 55 10.45 65.45 TOTAL (EURO) 2404.19 456.80 2860.99

Sediu : 700045 Iasi, Strada Sfantul Lazar nr. 27, Kapital Invest Building -  etajul 2
Depozit :
700382 Iasi,Str. Aurel Vlaicu 88
600343 Bacau,Str. Letea 32
062202 Bucuresti, Str. Preciziei 32
2059 Chisinau, Str. Petricani 19/4

Societate aflata in insolventa prin hotararea Tribunalului Iasi din 21 martie 2025, dosar nr. 1116/99/2025

Telefon Romania:

+40 743 122 261
office@commatech.ro